[vc_row background_style=”cover” css=”.vc_custom_1428460385159{margin-top: -1px !important;}”][vc_column][vc_separator color=”custom” accent_color=”rgba(0,0,0,0.1)”][/vc_column][/vc_row][vc_row background_style=”cover” css=”.vc_custom_1427792769516{margin-top: 30px !important;}”][vc_column][vc_column_text]
| S/n | Client | Project description | Period |
| 1 | BENSHORE/NEW-CROSS | Sweeping of Ekulama-1 Well no 03 and 017 | April- May, 2016 |
| 2 | AYAS/NECONDE | Procurement, Fabrication and replacement of Leaking Batan-9T Wellhead Hook-up Spool | January, 2016 |
| 3 | ITERLEN | Dredging of Flow station and Well Head areas at Opuama Field of OML 40 | August 2015 – Nov. 2015 |
| 4 | NGC/ZCNL | Installation of 36”x25km Gas Pipeline. EELP-02 | January, 2014- February, 2014 |
| 5 | NPDC | Construction an Utra-Modern Community town hall at Ekpe Community, Delta state | November,2014- June, 2015 |
| 6 | NESTOIL/NPDC | Dredging/Sweeping of 14 nos. well heads at Odidi, Delta State | October, 2013- date. |
| 7 | BRITANICA HDD | Welding of 36’’ x 1.365Km Gas pipeline | August- Sept, 2013 |
| 8 | SEPLAT | Dredging/Canalization works at Sapele Operational area | September, 2013 |
| 9 | MATRIX ENERGY | Sweeping of Matrix Energy Limited Jetty | August, 2013 |
| 10 | NIPP/ZCNL | Installation of 18”x1.5Km Gas Pipeline and Early-Gas facility Hook-up/Tie-in at Geregu Power Plant | Oct, 2012-July 2013 |
| 11 | NITOMATT | Dredging and Stock piling of sand for NITOMATT PROJECTS NIG. LTD at Otokutu village | January, 2011- December, 2012 |
| 12 | ZAKHEM/ NGC | Fabrication and Welding, Installation Works for Pig Receiver Station at Oben-Node for the ELP-01 | Oct. -Dec, 2012 |
| 13 | AVEON OFFSHORE | OAGM Project; Escravos-Dibi/Olero river tows | May, 2012 |
| 14 | ZAKHEM/ NGC | Fabrication/Installation and Hook-up at the ELP-01, Escravos Node | April, 2012 |
| 15 | PPMC/NNPC | Provision of support services to JTF Troops on NNPC Esc-Warri Crude Oil pipeline | Feb,2010- March, 2012 |
| 16 | DSV PIPETRONIXNG/ GASLINK | Fabrication and Hook-up/Tie-in of Gas De-sanding Unit at Iganmu Lagos | Dec, 2011- April, 2012 |
| 17 | ZAKHEM/ NGC | Construction, Installation and Testing of 30’’ Pipeline River Crossings Segment Between Warri and Oben | Aug, 2011- Dec, 2011 |
| 18 | PPMC/NNPC | Emergency Repair of NNPC Escravos- Warri 24’’ Crude Oil Pipeline at Kpokpo | August, 2010 |
| 19 | AVEON OFFSHORE | OAGM Project Removal and River Tow from Dibi and Olero to Escravos (Labour supply) | Oct- Dec, 2010 |
| 20 | NITOMATT | Dredging and Stock Pilling of sand at Otokutu community | October, 2010- date |
| 21 | ZAKHEM/ NGC | Hook-up and Tie-in with 18’’ Existing Gas Pipeline at Geregu, Ajeokuta | August, 2010 |
| 22 | PPMC/NNPC | Repair of 37 additional damaged points on the 24” diameter Escravos- Warri Crude Oil Pipeline | Dec, 2009- Jan, 2010 |
| 23 | PPMC/NNPC | Repair of 20 damaged points on the 24” diameter Escravos- Warri Crude Oil Pipeline | Sept, 2009- Nov, 2010 |
| 24 | PPMC/NNPC | Port Harcourt-Aba Pipeline Rehabilitation Project- System 2E/2EX Segment A, 0-9KM | Dec, 2009- Jan, 2010 |
| 25 | PPMC/NNPC | Standby Repairs/maintenance of PPMC Pipelines and Faculties between Warri and Lokoja Call-out contract | June, 2008-April, 2011 |
| 26 | PPMC | Sectioning of ruptured crude oil pipes at Idoah, Auchi Poly gate, Jattu Motor Park and Jattu Primary School | Dec, 2008 |
| 27 | PPMC/NNPC | Sectional Replacement of Vandalized 16 inches Products Pipe at Ijegun, Lagos | November, 2008 |
| 28 | HHI, Warri | Construction of Underground Pipe Supports for the Escravos Gas to Liquid Plant for HHI | May, 2008 |
| 29 | PPMC | Sectional Replacement of System-2C 16 inches crude line at Agugu, Okpella, Edo State | May, 2008 |
| 30 | PPMC | Sectional replacement of 6 inches product pipeline at Oloje, Ibadan | April, 2008 |
| 31 | PPMC | Sectional replacement of Systems 16 inches crude oil pipeline at Igbonla, Lokoja | March, 2008 |
[/vc_column_text][vc_column_text]
Featured Projects
| BENSHORE/NEW-CROSS | Sweeping of Ekulama-1 Well no 03 and 017 | April- May, 2016 |
[/vc_column_text][/vc_column][/vc_row][vc_row background_style=”cover” css=”.vc_custom_1427854157468{margin-top: 30px !important;}”][vc_column][ess_grid alias=”projects”][/vc_column][/vc_row][vc_row background_style=”cover” css=”.vc_custom_1427855420063{margin-bottom: 0px !important;padding-bottom: 0px !important;}”][vc_column][vc_row_inner css=”.vc_custom_1427943534694{margin-bottom: 0px !important;background-image: url(https://www.ashialin.com/wp-content/uploads/2014/01/6.jpg) !important;}”][vc_column_inner width=”3/4″ css=”.vc_custom_1427855081074{padding-top: 40px !important;padding-left: 40px !important;}”][vc_column_text]
Get A Free Quote For Your Next Project
Uniquely matrix economically sound value through cooperative technology. Competently parallel task fully researched data and enterprise process improvements. Collaboratively expedite quality manufactured products via client-focused results Synergistically deliver performance based methods of empowerment whereas distributed expertise
[dt_button url=”https://www.ashialin.com/contact-us” style=”ghost” size=”btn-default” skin=”light” target=”_self”]CONTACT US[/dt_button][/vc_column_text][/vc_column_inner][vc_column_inner width=”1/4″ css=”.vc_custom_1427855101862{padding-top: 15px !important;padding-bottom: 0px !important;}”][vc_single_image image=”12781″ img_size=”188×254″ alignment=”center” css=”.vc_custom_1485097819554{padding-bottom: 0px !important;}”][/vc_column_inner][/vc_row_inner][/vc_column][/vc_row]